A plan you might disagree with.

PLANEJA ENGINE · 03/03

The route arrives ready for review, rather than obedience. Remove one step, and the rest rebuilds with the impact recalculated.

See the five steps Return to the Planeja Engine ↖ ROUTES AND SCENARIOS THE ROUTE Step with owner, deadline, effort and expected impact. owner · deadline · effort THREE SCENARIOS Conservative, likely and aggressive, side by side. conservative · likely · aggressive RECOMMENDED likely scenario IMPACT stated EFFORT compared OWNER defined REVIEW open REVISABLE You disagree with a step and the route is rebuilt. remove · postpone · change owner THE COST OF NOT ACTING Doing nothing is also a choice with a price. baseline · projected deviation · response time HANDOFF TO AGE An approved route becomes work. human approval · owner · deadline

A good plan is not one that nobody challenges. It is one that stands up to challenge.

01 Analysis and research Researches inside and outside. 02 Mathematical engine Combines metrics from every source. 03 Routes and scenarios Creates reviewable plans.

01 · THE ROUTE

Step with owner, deadline, effort and expected impact.

Without an owner, a plan is a wish list. Without a stated impact, no one knows which step is worth the debate.

Sem data, o passo entra na fila atrás de tudo que já tem data. O esforço medido impede que o caro atrase o barato na mesma semana. A razão escrita segura o passo na primeira objeção de quem discorda. 01 O plano em execução Passo Escopo Responsável Prazo Entrega Impacto Cada passo tem responsável e prazo. 01 · A ROTA

02 · THREE SCENARIOS

Conservative, likely and aggressive, side by side.

Each shows what it recovers, how long it takes, and at what risk. The choice is yours; Planeja makes all three visible at the same time.

O conservador devolve 1,4 ponto de margem em três semanas e não bate a meta. O provável devolve 2,8 pontos em quatro semanas e fecha acima da meta. As mesmas colunas valem para os três, senão a comparação vira gosto pessoal. 02 Três cenários de margem Base comum Cenários Conservador, provável e agressivo. 02 · TRÊS CENÁRIOS

03 · REVIEWABLE

You disagree with one step and the route is remade.

Removing the price adjustment does not invalidate the plan: it recalculates what remains and shows how much of the result was lost with it.

Sem o passo removido, a rota cai de 2,8 para 2,5 pontos de margem. O prazo encolhe de quatro para três semanas e ainda fecha acima da meta. Adiar um passo ou trocar o dono refaz a conta inteira da rota. 03 Efeito de rever a rota Rota inicial +2,8 p.p. Rota revisada +2,5 p.p. Com a revisão, o prazo cai de 4 para 3 semanas. 03 · REVISÁVEL

04 · THE COST OF NO

Doing nothing is also a choice with a cost.

The route always brings the baseline: where the month closes if no one touches anything. It is against her that the others compare.

Parado, o negócio termina com margem de 31,4% e R$ 42 mil a menos no trimestre. O desvio projetado dá o tamanho do buraco e o prazo para reagir. Não agir é a opção invisível, e a tabela dá preço a ela. 04 O custo de manter a rota Margem observada Sem ação Cenário sem intervenção: margem de 31,4%. 04 · O CUSTO DE NÃO

05 · DELIVERY TO AGE

Approved route becomes work.

Planeja stops here. Once approved, the steps become tasks with an owner and deadline in the Age Engine, and Controla starts tracking the result.

A aprovação humana vem antes de qualquer criação do outro lado. O trabalho chega à ferramenta que o time já usa, com a referência da rota. A decisão de origem viaja junto e continua ligada ao que for executado. 05 Da rota à entrega Rota Proposta Revisão Aprovada Age Distribui A tarefa mantém a referência da decisão. 05 · ENTREGA PARA O AGE

THE ANATOMY OF A STEP

Every field exists because its absence breaks something. A plan without these five fields is a list of intentions. WHAT EVERY STEP CARRIES Owner Without a name, no one starts. It stays at “someone needs to look at this”. Deadline Without a date, it queues behind what has a date. Effort Without a size, the expensive step enters alongside the cheap one and blocks the rest. Expected impact Without a number, no one knows which step is worth the internal debate. Why Without a reason, the step becomes an order. An order without a reason does not survive the first objection. WHAT HAPPENS WITHOUT IT Orphaned plan Everyone agrees in the meeting and nothing moves on Monday. Unordered queue Someone else’s urgent work always goes first. Overrun scope The six-week step enters as if it took two days. Opinion-based debate The loudest voice wins, rather than the highest return. Silent reversal Someone undoes the step two months later without knowing what it solved.

That's why Planeja's route leaves with the five fields filled out, not with a list of topics.

TRULY REVIEWABLE

Remove a step and watch the plan rebuild. The recalculation shows what is lost with it. PROPOSED ROUTE Reduce the bundle discount +1.1 p.p. Renegotiate Southeast freight +0.9 p.p. Reallocate budget from the expensive channel +0.5 p.p. Raise the annual plan price +0.3 p.p.

+2.8 p.p. of margin 4 weeks

→ WITHOUT THE PRICE ADJUSTMENT

+2.5 p.p. of margin 3 weeks

Still closes above target, and two weeks earlier.

THREE SCENARIOS, ON THE SAME SCALE

Comparison requires the same columns for all three scenarios. Without a common scale, comparing scenarios becomes choosing what sounds best. SCENARIO WHAT CHANGES RECOVERY COST OF CHOOSING Conservative Only changes that do not affect volume discount, freight +1.4 p.p. in 3 weeks · low risk, but misses the target. Likely Reduce discounts, renegotiate and reallocate budget discount, freight, media +2.8 p.p. in 4 weeks · closes above target. Recommended. Aggressive All of the above, plus a price adjustment discount, freight, media, price +4.1 p.p. in 6 weeks · restrains growth in the quarter. Do nothing Baseline no action Margin closes at 31.4%, leaving the quarter R$ 42 thousand short.

The baseline enters the table on purpose: not acting is also a choice, and it has price.

WHERE THE ROUTE GOES

Approved here, the step becomes work there. Planeja proposes. The Age Engine executes within tools the team already uses. CU ClickUp tasks · lists · documents MO Monday.com boards · items · columns TR Trello boards · lists · cards GC Google Calendar events · calendars · availability SL Slack channels · messages · threads MT Microsoft Teams channels · messages · meetings NO Notion pages · databases · comments

No task is created without someone approving the route first.

See connector catalog

THE REPERTORY OF THIS CHAPTER

How a plan becomes a priority order. Ranking by impact and effort separates a route from a wish list. Impact × effort prioritization matrix puts first what yields more for less cost Urgent × important Eisenhower separates what needs you from what needs someone else Integrated mix · 4Ps Kotler checks that changing the price does not break the product’s promise Scenarios scenario planning compares conservative, likely and aggressive on the same scale Cost of inaction baseline puts a price on doing nothing, the invisible option Responsibility matrix (RACI) route roles define the owner before the step becomes a task in the Age Engine

If two steps dispute the same owner in the same week, the route warns instead of stacking.

WHERE THIS HAPPENS

This chapter is part of the second engine. 01 Conecta

It brings the metrics spread across each tool and maintains visible source, access and gaps.

→ 02 Planeja

Absorb these metrics, calculate on top of the set and return revisable routes.

→ 03 Age

Executes the approved route with an owner, deadline and human approval when needed.

→ 04 Controla

Tracks the result, anticipates deviations and returns new context.

↺

The result returns to the Conecta Engine as new metric, decision and evidence.

THE CYCLE CONTINUES

From now on, it's Age's job.

The approved route becomes a task with owner and deadline, and the result returns to context.

Return to the Planeja Engine Talk to the team